Final walkthrough checklist for a kitchen or bath remodel

Short answer: The final walkthrough is where the contractor and the owner walk the finished room together and write down what is left. The goal is one list both sides agree on before anyone leaves.

By · Updated · 5 min read · En español

This checklist is for the person running the job. It is general information, not legal advice.

Before you walk

Close the permit. If the job was permitted, the building department has its own last step. The International Residential Code, as one city that adopts it quotes it, says the final inspection "shall be made after the permitted work is complete and prior to occupancy." That sentence is about the permit. It says nothing about paint lines or cabinet reveals. Those are contract matters, and they are what your walkthrough is for. Rules differ by city and county, so ask your own building department.

Bring the paperwork. Bring the contract, the selections and every change order. California's contractor board tells homeowners that changes to the contract "need to be in writing and signed by both parties." A signed change order settles what was agreed.

Set the room up. Power on. Water on. All protection and tape off. Lights on and a flashlight in hand. Walk in daylight if you can.

Every room: go one surface at a time

  • Floor. Chips, lippage, grout gaps, squeaks, transitions, base and shoe tight to the floor.
  • Walls. Paint holidays, cut lines, patches that show under a raking light, switch and outlet plates on and straight.
  • Doors and windows. Open, close, latch and lock each one. Check stops, strikes and weatherstrip.
  • Caulk. Every joint where two materials meet: counter to splash, tub to tile, trim to wall.

Kitchen checklist

Bath checklist

Houses built before 1978

If the house was built before 1978 and the job disturbed paint, federal lead rules apply. EPA's Renovation, Repair and Painting rule requires firms paid to do that work to be certified and to use lead-safe work practices. Know whether that covers your job before you walk it.

Write it up before anyone leaves

  • One line per item: where, what, who fixes it, by when.
  • One photo per item, taken on the spot.
  • Agree on the list in the room. Both sides sign and date it.
  • Set a date to re-walk with the same list.

What the owner has been told about final payment

Expect the owner to hold the last check until the list is closed. The Federal Trade Commission tells homeowners to "never make the final payment until the work is done and you're satisfied with it." California's contractor board says to avoid making the final payment "until you're satisfied with the work." Neither source defines "satisfied." Your contract should. Tie final payment to the signed list, not to a feeling.

Punchwalk, an Android app for walking a job and sending the list as a PDF, is coming soon to Google Play.

Sources

Every figure on this page comes from these sources. If you spot an error, tell us here or email support@goodhandsapps.com.

  1. City of Bluefield, "Required Inspections" (quotes International Residential Code R109.1.6) (cityofbluefield.com)
  2. California Contractors State License Board, "Before Hiring A Contractor: Construction Project Checklist" (cslb.ca.gov)
  3. California Contractors State License Board, "Construction Project Checklist" (2025) (cslb.ca.gov)
  4. Federal Trade Commission, "How To Avoid a Home Improvement Scam" (consumer.ftc.gov)
  5. U.S. Consumer Product Safety Commission, "What Is a GFCI?" fact sheet, Pub. 099 (cpsc.gov)
  6. U.S. Consumer Product Safety Commission, "Range Tipovers: An Evaluation of Range Stability" (2011) (cpsc.gov)
  7. U.S. EPA WaterSense, "Free of Leaks" technical sheet, EPA-832-F-23-016 (epa.gov)
  8. U.S. Department of Energy Building America Solution Center (PNNL), "Bathroom Exhaust Fans" (basc.pnnl.gov)
  9. U.S. EPA, "Lead Renovation, Repair and Painting Program" (epa.gov)